1. Electrical metallic conduits are installed according to the latest edition of
Philippine Electrical Code and National Electrical Code.
2. Electrical metallic conduits are installed according to the job requirements
3. Tools/equipment and materials needed for the installation are prepared in line
with job requirements.
4. Safety procedures in installing electrical metallic conduits are strictly observed
according OHS guidelines and procedures.
PEC provisions on electrical metallic conduits
Bending electrical metallic conduit
Procedures in installing electrical metallic conduit
Safety procedures in installing electrical metallic conduits
Students/trainees must be provided with the following:
Tools and Equipment Materials
o Lineman’s pliers o Electrical metallic conduits
o Long nose pliers o lock nuts, bushing, adapters
o Diagonal cutting pliers o fastening devices
o Set of screw driver o Conduit supports
o Claw hammer
o Hacksaw Learning Materials
o Measuring tools o Learning elements
o Pipe vise o Manuals
o Pipe cutter o Books and
o reamer o Philippine Electrical Code/National
o Simulated workplace/wiring Electrical Code, Latest Edition
Demonstration
Discussion
Practical Exercises
Laboratory exercises
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 49 -
LO2. INSTALL WIREWAYS AND CABLE TRAYS
1. Wire ways and cable trays are installed according to the latest edition of
Philippine Electrical Code and National Electrical Code.
2. Wire ways and cable trays are installed according to the job requirements
3. Tools/equipment and materials needed for the installation are prepared in line
with job requirements.
4. Safety procedures in installing wire ways and cable trays are strictly observed
according OHS guidelines and procedures.
PEC/NEC provisions on wire ways and cable trays
Procedures in installing wire ways and cable trays
Safety procedures in installing wire ways and cable trays
Students/trainees must be provided with the following:
Tools and Equipment Materials
o Lineman’s pliers o Wireways and cable trays and its
o Long nose pliers associated fittings
o Diagonal cutting pliers
o Set of screw driver Learning Materials
o Claw hammer o Learning elements
o Hacksaw o Books and manuals
o Measuring tools o Philippine Electrical Code/National
o Pipe vise Electrical Code, Latest Edition
o Simulated workplace/actual
workplace
o Ladder
Demonstration
Discussion
Practical Exercises
Laboratory exercises
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 50 -
LO3. INSTALL TELEPHONE TERMINAL CABINET
1. Telephone terminal cabinet is installed according to the latest edition of Philippine
Electrical Code and National Electrical Code.
2. Telephone terminal cabinet are installed according to the job requirements
3. Tools/equipment and materials needed for the installation are prepared in line
with job requirements.
4. Safety procedures in installing telephone terminal cabinet are strictly observed
according OHS guidelines and procedures.
PEC/NEC provisions on telephone terminal cabinet
Procedures in installing telephone terminal cabinet trays
Safety procedures in installing telephone terminal cabinet
Students/trainees must be provided with the following:
Tools and Equipment Materials
o Lineman’s pliers o Telephone terminal cabinet and
o Long nose pliers associated fittings
o Diagonal cutting pliers
o Set of screw driver Learning Materials
o Claw hammer o Learning elements
o Hacksaw o Manuals
o Books and
o Philippine Electrical Code/National
Electrical Code, Latest Edition
Demonstration
Discussion
Practical exercises
Laboratory exercises
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 51 -
LO4. INSTALL CABLE BRIDGE
1. Cable bridges are installed according to the latest edition of Philippine Electrical
Code and National Electrical Code.
2. Cable bridge are installed according to the job requirements
3. Tools/equipment and materials needed for the installation are prepared in line
with job requirements.
4. Safety procedures in installing cable bridges are strictly observed according OHS
guidelines and procedures.
PEC provisions on cable bridge
Procedures in installing cable bridge
Safety procedures in installing cable bridge
Students/trainees must be provided with the following:
Tools and Equipment Materials
o Lineman’s pliers o Cable bridge and associated fittings
o Long nose pliers
o Diagonal cutting pliers Learning Materials
o Set of screw driver o Learning elements
o Claw hammer o Books and manuals
o Hacksaw o Philippine Electrical Code, Latest
o Measuring tools Edition
o Simulated workplace/wiring
Demonstration
Discussion
Practical exercises
Laboratory exercises
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 52 -
UNIT OF COMPETENCY : INSTALL WIRING DEVICES FOR FLOOR AND GROUND
FAULT CURRENT INTERRUPTING OUTLETS
MODULE TITLE : INSTALLING WIRING DEVICES FOR FLOOR AND
GROUND FAULT CURRENT INTERRUPTING OUTLETS
MODULE DESCRIPTON : This module covers the knowledge, skills and proper attitude
in installing wiring devices such as GFCI outlets and other
special wiring devices.
NOMINAL DURATION : 30 hours
QUALIFICATION LEVEL : NC II
SUMMARY OF LEARNING OUTCOMES:
Upon completion of this module the trainees/student must be able to:
LO1. Select wiring devices
LO2. Install wiring devices
CBC Electrical Installation and Maintenance NC II - 53 -
LO1. SELECT WIRING DEVICES
1. Wiring devices are inspected for damage according manufacturer’s specification.
2. Wiring devices are selected according to the job requirements
Selecting wiring devices
GFCI protected outlets.
Students/trainees must be provided with the following:
Supplies and Materials
o Wiring devices
Learning Materials
o Learning elements
o Drawing plan
o Books, manuals, and catalogs
o Philippine Electrical Code
Demonstration
Discussion
Practical exercises
Laboratory exercises
Audio/Visual film showing
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 54 -
LO2. INSTALL WIRING DEVICES
1. Wiring devices are installed according to the latest edition of Philippine Electrical
Code and National Electrical Code.
2. Wiring devices are installed according to the job requirements
3. Tools/equipment and materials needed for the installation are prepared in line
with job requirements.
4. Safety procedures in installing Wiring devices are strictly observed according
OHS guidelines and procedures.
Wiring devices
PEC provisions on wiring devices
Procedures in installing wiring devices
Safety procedures in wiring devices
GFCI protected outlets.
Students/trainees must be provided with the following:
Equipment Supplies and Materials
o Simulated work place or o Wiring devices
actual work place
o ladder Learning Materials
o Learning elements
Tools o Drawing plan
o Linesman’s pliers o Books, manuals, and catalogs
o Long nose pliers o Philippine Electrical Code
o Diagonal cutting pliers
o Bar level
o Screw drivers,
o Set of screw drivers
o Chisel
Demonstration
Discussion
Practical exercises
Laboratory exercises
Audio/Visual film showing
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 55 -
UNIT OF COMPETENCY : INSTALL ELECTRICAL PROTECTION SYSTEM FOR
LIGHTING AND GROUNDING
MODULE TITLE : INSTALLING ELECTRICAL PROTECTION SYSTEM FOR
LIGHTING AND GROUNDING
MODULE DESCRIPTOR : This module covers the knowledge, skills and proper attitude
in installing electrical protection system. It deals with
installation of high/low voltage switch gear, earth leakage
circuit breaker, lightning protection and grounding system.
NOMINAL DURATION : 30 hours
QUALIFICATION LEVEL : NC II
SUMMARY OF LEARNING OUTCOMES:
At the completion of this module the trainees/student must be able to:
LO1. Plan and prepare work
LO2. Install electrical protection system
CBC Electrical Installation and Maintenance NC II - 56 -
LO1. PLAN AND PREPARE WORK
1. Instructions for the preparation of the work activity are communicated and
confirmed to ensure clear understanding.
2. Tools, equipment and PPE needed to install electrical protection system are
identified, checked to ensure they work correctly as intended and are safe to use
in accordance with established procedures.
3. Materials needed for work are obtained in accordance with established
procedures.
Planning and preparing work.
Students/trainees must be provided with the following:
Learning Materials
o Learning elements
Demonstration
Discussion
Practical exercises
Laboratory exercises
Audio/Visual film showing
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 57 -
LO2. INSTALL ELECTRICAL PROTECTION SYSTEM
1. Electrical protection system is installed according to the latest edition of
Philippine Electrical Code and National Electrical Code.
2. Electrical protection system is installed according to the job requirements
3. Tools/equipment and materials needed for the installation are prepared in line
with job requirements.
4. Safety procedures in installing electrical protection system are strictly observed
according OHS guidelines and procedures.
PEC provisions on electrical protection system
Procedures in installing electrical protection system
Safety procedures in installing electrical protection system
Students/trainees must be provided with the following:
Materials Learning Materials
o High/low voltage switch gear o Learning elements
o Earth leakage circuit breaker o Drawing plan/sketch
o Grounding equipment o Diagrams
Demonstration
Discussion
Practical exercises
Laboratory exercises
Audio/Visual film showing
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 58 -
UNIT OF COMPETENCY : INSTALL ELECTRICAL LIGHTING SYSTEMS ON
MODULE TITLE AUXILIARY OUTLETS AND LIGHTING FIXTURES
MODULE DESCRIPTOR
NOMINAL DURATION : INSTALLING ELECTRICAL LIGHTING SYSTEMS ON
QUALIFICATION LEVEL AUXILIARY OUTLETS AND LIGHTING FIXTURES
: This module covers the knowledge, skills and attitude in
installing lighting fixtures.
SUMMARY OF LEARNING OUTCOMES:
At the completion of this module the trainees/student must be able to:
LO1. Plan and prepare work
LO2. Install lighting fixture
CBC Electrical Installation and Maintenance NC II - 59 -
LO1. PLAN AND PREPARE WORK
1. Instructions for the preparation of the work activity are communicated and
confirmed to ensure clear understanding
2. Tools, equipment and PPE needed to install lighting system are identified,
checked to ensure they work correctly as intended and are safe to use in
accordance with established procedures
3. Materials needed for work are obtained in accordance with established
procedures
Planning and preparing work.
Students/trainees must be provided with the following:
Learning Materials
o Learning elements
Demonstration
Discussion
Practical exercises
Laboratory exercises
Audio/Visual film showing
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 60 -
LO2. INSTALL LIGHTING FIXTURE
1. Lighting fixtures are installed according to the latest edition of Philippine Electrical
Code and National Electrical Code.
2. Lighting fixtures are installed according to the job requirements
3. Tools/equipment and materials needed for the installation are prepared in line
with job requirements.
4. Safety procedures in installing lighting fixtures are strictly observed according
OHS guidelines and procedures.
PEC provisions on installing lighting fixtures
Procedures in installing lighting fixtures
Safety procedures in installing lighting fixtures
Floodlights/Spotlights
Track Lights
High/Low Bay Sodium Vapor Lamps
Halogen Lamps
Perimeter Lighting
Students/trainees must be provided with the following:
Tools and Equipment Equipments
o Lineman’s pliers o Wiring booth/Simulated
o Long nose pliers workplace/wiring booth
o Diagonal cutting pliers o PPE
o Set of screw driver
o Claw hammer Learning Materials
o Hacksaw o Learning elements
o Measuring tools o Manuals
o reamer o Books and
o Ladder o Philippine Electrical Code/National
Electrical Code, Latest Edition
Demonstration
Discussion
Practical exercises
Laboratory exercises
Audio/Visual film showing
Demonstration
Direct observation and questioning
CBC Electrical Installation and Maintenance NC II - 61 -
What is Competency-Based Curriculum (CBC)
A competency-based curriculum is a framework or guide for the
subsequent detailed development of competencies, associated
methodologies, training and assessment resources.
The CBC specifies the outcomes which are consistent with the
requirements of the workplace as agreed through the industry or
community consultations.
CBC can be developed immediately when competency standards
exist.
When competency standards do not exist, curriculum developers
need to clearly define the learning outcomes to be attained. The
standard of performance required must be appropriate to industry
and occupational needs through the industry/enterprise or
specified client group consultations.
These materials are available in both printed and electronic copies.